Determining the optimal periodicity for preventive replacement of mechanical spare parts

Authors

  • Ryma Berrehal Mentouri University of Constantine
  • S. Benissaad

DOI:

https://doi.org/10.5755/j01.mech.22.2.12269

Keywords:

optimal periodicity, preventive replacement, mechanical spare parts

Abstract

The goal of this work is determining the periodicity t0 which the preventive maintenance will execute for minimizing the operation cost. This type of preventive change is very used in practice by industrial manufacturing. In this study, we choose the model of block replacement type1: A failed unit is replaced instantaneously at failure. The mathematical model used is based on the Weibull law with γ= 0. The results obtained are discussed according to the values of the parameters of the Weibull law β and η and of the costs of preventive maintenance and corrective

DOI: http://dx.doi.org/10.5755/j01.mech.22.2.12269

Author Biography

Ryma Berrehal, Mentouri University of Constantine

Mechanical Engineering

Downloads

Published

2016-04-20

Issue

Section

DESIGN AND OPTIMIZATION OF MECHANICAL SYSTEMS